Plan 9 from Bell Labs’s /sys/src/pub/doc/powerfail

Copyright © 2021 Plan 9 Foundation
Distributed under the MIT License.
Download the Plan 9 distribution.


Things to check after powerfail:

1) power up, in this order:
	lookout				# standalone dhcp, tftp, ns, auth server
	coraid sr1521			# aoe raid disk server
	pie				# venti & main file server [see note 4]
	chips				# service cpu server, serves outside
	neeps				# primary dhcp, tftp server, ns
	soylent				# shared linux, runs our vms
	fish				# main interactive cpu server
	tatties				# serial console server
	boundary			# lookout backup
1a) and outside machines:
	vfw, inet			# soekris local firewalls (netbsd)
	vespine, vespine2		# viaduct servers [see note 3]
	bovril				# outside file server
	mince				# outside web, mail, cpu server
	haggis				# outside sources server
	roku				# outside special-purpose cpu server
	go				# doe hare collaboration
1b) don't worry about these machines:
	ella, ham, cheese, toast	# doe hare amd64+infiniband
	abmx				# fast cpu server

3)	vespine and vespine2 are green soekris machines near the omniswitches.
	(inet and vfw are there too.)
	They control the viaducts (home bridge-and-tunnel boxes).

4)	If a Plan 9 machine is saying "boot from:" on the console,
	try the string		ether0

5)	The SWT Twin systems take a long time to boot; be patient.

emergency numbers:
Geoff Collyer	home:908-517-9109  cell:510-593-0284
Jim Mckie       home:908-665-0753  cell:908-405-2259

Bell Labs OSI certified Powered by Plan 9

(Return to Plan 9 Home Page)

Copyright © 2021 Plan 9 Foundation. All Rights Reserved.
Comments to webmaster@plan9.bell-labs.com.